ExamPlay Dark Logo
Jelentkezzen be

WAEC - Computer Studies (2014 - No. 20)

Fig.2 is a system development cycle. Use it to answer the question below

The path labelled I is the __________?

System design
System implementation
Study review
Feasibility study

Magyarázat

The part labeled I  is the feasibility study.

Megjegyzések (0)

Bejelentkezés a hozzászóláshoz
Hirdetés
BrainBehindX Inc Logo
©2026; Powered by BrainBehindX Inc