Přihlaste se
JAMB - Commerce (2016 - No. 1)
The cost which is incurred asa result of failure to load or unload a ship at the ports within a specified period is referred to as
demurrage charges
premium charges
excess charges
trade charges
Komentáře (0)
Přihlaste se pro komentář
Inzerát
Povolit javascriptu, aby správně načetl tuto stránku